Home / Engineering Construction
Engineering Construction
TAMS has been delivering complex marine construction projects for more than 25 years, combining specialist expertise, in-house capability, and a bespoke fleet to provide clients with certainty of outcome.
Our approach is built on a pragmatic understanding of marine environments, developed through decades of experience in constructing and maintaining critical infrastructure across ports, harbours, and coastal assets.
We provide a fully self-perform model that integrates engineering, construction, logistics, diving, and fleet operations. This allows us to control the key variables: schedule, access, safety, and quality – while reducing reliance on third parties. By maintaining direct access to the workfront through modern vessels, barges, and subsea teams, we are able to deliver efficient, end-to-end solutions for complex projects ranging in scale.
Our people are the foundation of our capability. Skilled, longstanding, and adaptable, they bring creativity and innovation to every challenge. From early design involvement through to final commissioning, our teams develop practical, construction-led solutions that balance technical requirements with the realities of working in dynamic marine settings.
By bringing together specialist knowledge, multi-disciplinary expertise, and modern fleet capability, TAMS delivers reliable, high-quality marine construction outcomes for critical infrastructure.
What we do
- Wharf and Jetty Design & Construction
- Piling and Structural Works
- Dredging and Reclamation
- Breakwaters and Coastal Protection
- Subsea Construction and Diving Services
- Marine Logistics and Towage
- Specialist Demolition and Decommissioning
Expertise at work
Design and construction of floating wharf in Broome
Project overview
Broome has long been a strategic northern gateway for Australia’s resources, defence, and tourism industries. Yet the port’s ageing wharf, built for a different era, was unable to meet the demands of modern trade. The region’s extreme tidal range – rising and falling up to ten metres within six hours – restricted operations to short tidal windows, driving inefficiency and deterring larger vessels. Freight remained slow and expensive, limiting competitiveness and curtailing Broome’s potential as a 24/7 logistics hub. Conventional expansion methods such as dredging carried unacceptable environmental risks for the pristine Kimberley coastline. A new marine facility was required: one that enabled all-tide operations while protecting local ecosystems and meeting community expectations.
Scope of work
The Kimberley Marine Support Base consortium engaged TAMS Group to design and construct a new floating wharf and approach causeway. The contract demanded more than delivery of infrastructure, it required collaborative problem-solving, innovative engineering, and respect for environmental and cultural requirements. The scope included a 165-metre by 50-metre floating wharf positioned in naturally deep water, a 300-metre trestle causeway, link-span ramp and integration of essential services such as power, water, firefighting, and navigation systems.
Solution
From the outset, TAMS adopted a relationship-based contracting model with Kimberley Ports Authority, regulators, Traditional Owners, and the community. Design development prioritised sustainability, resilience, and constructability. The floating wharf concept eliminated dredging, reducing seabed disturbance.
Construction sequencing was carefully aligned with Broome’s climate and tidal windows. Seabed surveys and piling were completed using specialist jack-up barges and rigs, ensuring control of safety, quality, and productivity. Offshore modular fabrication of pontoon units allowed parallel progress, with modules transported to site and lifted into position using heavy-lift marine cranes. The pontoons were then connected through hinged systems to form a continuous platform, fitted with fenders, bollards, and mooring facilities.
The trestle causeway and link-span ramp were constructed to provide seamless vehicle and cargo access, while roadworks maintained safe community use during construction. Services were extended along the structure, and final commissioning included load testing and trial berthings.
The result is a resilient, dynamic facility enabling uninterrupted operations across all tides. It will support resources, Defence, bulk cargo, livestock, cruise, and emerging green energy industries. By combining engineering innovation, pragmatic construction delivery and environmental stewardship, TAMS has delivered legacy infrastructure that secures Broome’s future as a world-class logistics hub.
Client
KMSB
Location
Broome, Western Australia
Duration
2022-2025
Project gallery
Specialist vessels used
Flinders Bay Barge
Phasellus ullamcorper nulla sollicitudin mollis nunc mauris. Et tempor et consequat duis purus. Risus augue hac nullam nam viverra rhoncus. Dui faucibus.
Seahorse Chuditch Tug
Vel pharetra tellus pulvinar a quis ornare posuere eu in. Accumsan est erat rhoncus dolor praesent orci dictum pellentesque etiam. Consequat sem id lorem.
Alkira Utility Vessel
Blandit aenean aliquet ultrices vivamus placerat vitae eu cursus. Quis eget in pretium at. Nec nibh justo risus iaculis neque mauris eget scelerisque lorem.